As an EV infrastructure power solutions provider, AK Power Solutions has developed a new solution that takes a different approach on how you can power sites. When setting up your site for power 3 key elements are needed., Medium Voltage Breaker, Dry Transformer and Low Voltage Switchgear.
Integrated Power Solution combines 3 key components into a single unit so issues like procurement and field coordination are removed along with the elimination of weeks of digging and trenching. Instead you have a SINGLE unit with a smaller footprint that can be installed in one day.
KVA | HV(kV) | LV(V) | Breaker Frame | Main Breaker |
---|---|---|---|---|
500 | 4- 35 | 480 | 1,200 | 800 |
750 | 4- 35 | 480 | 1,200 | 1,200 |
1,000 | 4- 35 | 480 | 1,600 | 1,500 |
2,000 | 4- 35 | 480 | 4,000 | 3,000 |
2,600 | 4- 35 | 480 | 4,000 | 4,000 |
3,250 | 4- 35 | 480 | 4,000 | 4,000 |
3,750 | 4- 35 | 480 | 6,000 | 6,000 |
4,000 | 4- 35 | 480 | 6,000 | 6,000 |
*Additional configurations are available
Primary (HV) / Secondary Configuration (LV)
Delta / WYE / Grounded WYE
Phase
3-Phase
Medium Voltage Protection
Breaker / Fused Switch / Switch
Location
Primary Transformer / Main Breaker / 2nd Level Breaker
Type
Electronic / Thermal Magnetic
Pole
1 - Pole / 3 Pole
Connection
Bus Bar / Cable
Second Level
300 / 400 / 600 / 800 AMP
Endosure Type
NEMA 1 / NEMA 3R
Maximum Altitude
6560 ft (2000m) Above Sea Level
Minimum
-20°C
Average
30°C
High
50°C
Direction
Bottom / Top / Side
Loop
Allows for Daisy Chain of IPM
Weeks
Industry Lead Time
*Lead Time for Standard Configurations